Hiki District City,

Saitama

Hiki District, Saitama Prefecture Full Renovation of Detached House

Transformation

Before & After

Hero Before Hero After
Before 01 After 01
Before 02 After 02
Before 03 After 03
Before 04 After 04
Before 05 After 05

Summary

This akiya was reborn into a Japanese-style home for the next generation. While modern systems were added for comfort, we preserved traditional features like beams, sliding doors, and tatami, keeping the soul of the house alive. The result is a warm, timeless space where tradition and modern living meet.

Features

  • Wallpaper replacement and board cross installation (all rooms)
  • CF (cushion floor) installation (toilet, washroom)
  • Flooring replacement (hallway, LDK)
  • Baseboard replacement (Japanese-style room, LDK)
  • Tatami mat resurfacing (6-mat x 2 rooms)
  • Shoji and fusuma paper replacement
  • Installation of hinged door (Japanese-style room)
  • Washbasin replacement
  • Toilet replacement
  • Kitchen replacement
  • Traditional bath to Unit bath installation
  • Outlet and switch replacement (15 locations)
  • Gas water heater replacement
  • Distribution board replacement
  • Entrance door glass replacement
  • Outdoor water tap replacement (parking area)
  • Exterior wall and roof painting
  • Exterior block wall cleaning
  • Tree trimming
  • House cleaning
  • Final check after construction

Process

  • Consultation / Initial Discussion — We introduce the process, provide Q&A, and assess and suggest based on the property’s condition and purpose.
  • On-site Investigation — We conduct a full inspection of the property.
  • Client Hearing — We confirm renovation preferences before preparing the quotation.
  • Quotation Submission — Estimated timeline is approximately 2 weeks depending on renovation scale.
  • Review and Adjustment — Adjustments are made based on client budget and preferences.
  • Contract and Payment — After final agreement, we proceed with full payment and contract signing via CloudSign.
  • Construction Preparation — Materials are ordered and construction is scheduled after payment confirmation.
  • Construction Period — Duration is approximately 1 month and 2 weeks. A construction schedule sample is available upon request.
  • Final Check — We conduct a thorough final check for completion of renovation.
  • Project Completion and Handover — The project is completed and officially handed over to the client.

Other Services

  • Infrastructure support service
  • Rental property management
  • House Insurance support

Interested in a similar renovation?

Our multilingual staff will assist you in your language.